000/ Northline

We filmThe partNobody sees.

Manchester. Four people.
Films for people who make things.

Factories, kitchens, laboratories and the people in them. Four of us, one camera most days, and a preference for the quiet shot over the drone one.

A factory floor in Bolton, daylight through high windows
Bolton, for Hartley Engineering. 2026.
001/ What we make

Brand films.

2 to 4 min. 8 to 18k GBP

One film that explains who you are, made to last three years rather than three weeks.

Documentary shorts.

5 to 12 min. 12 to 30k GBP

A person, a place and a real story. Usually the work people actually watch to the end.

Product films.

30 to 90 sec. 4 to 9k GBP

Close, slow and properly lit. Made for a website rather than a feed.

Event coverage.

2 to 5 min. 3 to 6k GBP

A conference or a launch, cut in three days rather than three weeks.

Pennine NHS Trust. Four frames.
Frame 1 from the Pennine shootFrame 2 from the Pennine shootFrame 3 from the Pennine shootFrame 4 from the Pennine shoot

Four frames from the Pennine shoot. Third one made the cut.

003/ Process

How a film gets made

Week 1

We come and look.

A day on site with no camera, talking to the people who will be in it.

Week 2

A treatment, in writing.

Two pages: what the film is, who speaks, and what it will cost. No mood boards.

Week 3

Shoot.

Usually two days. We work around your shifts rather than the other way round.

Week 5

First cut.

One round of notes included, a second if the first changes the shape.

Week 7

Delivered.

Master, subtitled version, social crops and the raw files if you want them.

004/ Team

The four of us

Rosa Elliott

Rosa Elliott

Director
Sam Okoye

Sam Okoye

Cinematographer
Hannah Bruce

Hannah Bruce

Producer
Dan Field

Dan Field

Editor and colour

They spent the first day not filming, which I thought was a waste of money until I saw what they came back with.

Paul Hartley, Hartley Engineering
005/ Budgets

What things cost

Under 5,000 GBP

One shoot day, one deliverable, a tight cut.

5,000 to 15,000 GBP

Most brand films. Two days, a proper grade and a sound mix.

Above 15,000 GBP

Documentary work, multiple locations, original music.